This project involved the construction of a 2.5-meter by 5-meter reinforced concrete culvert designed to enhance drainage and prevent flooding within the LEKMA jurisdiction. Engineered to manage significant water flow, the culvert ensures long-term durability, functionality, and resilience under demanding conditions.
In addition to serving as a critical drainage solution, the culvert also functions as a bridge, providing a vital link between Teshie and Nungua Estates. Its dual purpose enhances accessibility while reducing flood risks for residents.
This project reflects a strong commitment to quality construction and community-focused solutions, delivering a durable and efficient infrastructure that addresses both drainage and transportation needs for the LEKMA municipality.
7.8 Million Work Hours 1,800+ Employees on-site 45 Excavators Used During Peak
8,500+ Metric Tons of Steel 621 Modules & Sections 1350 Linear Meters
Tag:
Share
Contact us today with any questions you may have, and let Abeikumah assist you with expert guidance and support.
Abeikumah Assistant
Let's get started. Enter your email to begin chatting with us.