This project involved the construction of a 2.5-meter by 5-meter reinforced concrete culvert designed to enhance drainage and prevent flooding within the LEKMA jurisdiction. Engineered to manage significant water flow, the culvert ensures long-term durability, functionality, and resilience under demanding conditions.
In addition to serving as a critical drainage solution, the culvert also functions as a bridge, providing a vital link between Teshie and Nungua Estates. Its dual purpose enhances accessibility while reducing flood risks for residents.
This project reflects a strong commitment to quality construction and community-focused solutions, delivering a durable and efficient infrastructure that addresses both drainage and transportation needs for the LEKMA municipality.
7.8 Million Work Hours 1,800+ Employees on-site 45 Excavators Used During Peak
8,500+ Metric Tons of Steel 621 Modules & Sections 1350 Linear Meters
Tag:
Share
Contact us today with any questions you may have, and let Abeikumah assist you with expert guidance and support.